Product Details
Place of Origin: China
Brand Name: JingSu ShengMan
Certification: CE and ISO9001
Model Number: HZG
Payment & Shipping Terms
Minimum Order Quantity: 1set
Price: USD30,000-USD300,000
Packaging Details: Plywood Cases
Delivery Time: 60-90days
Payment Terms: L/C, T/T
Supply Ability: 10sets
Application: |
FOOD |
Voltage: |
220v/380v |
Warranty: |
1 Year |
Color: |
Customer's Request |
Heating Source: |
Steam, Electric |
Condition: |
100% NEW |
Weight: |
2.9-104.9t |
Material: |
SUS304, SUS304 |
Capacity: |
0.5--10 Tons Per Hour |
Installation: |
Engineer Guidance Installation |
Revolution: |
2-7r/min |
Application: |
FOOD |
Voltage: |
220v/380v |
Warranty: |
1 Year |
Color: |
Customer's Request |
Heating Source: |
Steam, Electric |
Condition: |
100% NEW |
Weight: |
2.9-104.9t |
Material: |
SUS304, SUS304 |
Capacity: |
0.5--10 Tons Per Hour |
Installation: |
Engineer Guidance Installation |
Revolution: |
2-7r/min |
High Temperature Rotary kiln Dryer for Drying Catalyst Powder , HZG Rotary Drum Drying Equiement
Introduction
Mostly the machine is used in per burning of rigid magnet oxygen Pulverized fodder, it is also suitable for the cement, metallurgy and chemical industry, it is made up of main kiln body and supporting Drive set cooling pipe and supporting drive set, fuel system, electricity control secondary air set, exhaust dust and warm-up kiln body etc. The machine has function like: give an alarm for over temperature, give an alarm for over loading, auto control for working temperature,oxygen atmosphere is adjustable in the kiln etc.
Work Principle
When the damp raw material is fed from one material, it is turned over through blades that are distributed inside the cylider and wil be distrubuted uniformly in the drier and contact fully with the countercurrent hot air. In this way, the process of heat conduction is increased.During the period of dry, under the effect of incine blades and hot air stream,raw material can be moved to the star section of drier and discharged from discharging value.
Technical parameters
raw material | ore | vesicant | slag of blast furnace | coal |
amount to be treated (kg/h) | 1000 | 466 | 15000 | 5000 |
primary moisture(%) | 30 | 13 | 6 | 6.5 |
final moisture (%) |
15 | 0.3 | 1 | 0.1 |
average diameter(mm) | 6.5 | 0.05 | 4.7 | 5 |
amount of hot air(m³/kg) | 39000 | 5400 | 10750 | 16000 |
temp of air at inlet (℃) | 600 | 165 | 500 | 570 |
temp of material at outlet(℃5) | 42 | 100 | 75 | |
way of heating | gas | electric | heavy oil | heavy oil |
revolution (r.p.m) | 4 | 4 | 3.5 | 2 |
length of dryer | 20 | 12 | 17 | 16 |
Application
Applicable to powder, particle, piece and power mix in paste of chemical, metallurgy, architectural material and light industry. In chemical industry, it can used to be dried as like ammonium sulfide, ammonium nitrate, urea, ethane diacid, potassium dichromate, PVC, manganese dioxide, calcium carbonate, calcium phosphate fertilizer, calcium superphosphate(light quality and heavy quality), sodium phosphate, polysodium phosphate…
Features:
. High in the extent of mechanization and strong in production capacity.
. The resistance for fluid passing through the cylinder is small. The consumption of power and energy is low.
. It has strong adaptability to the properities of raw material.
. The operation is stable. The cost of operation is cheap. The uniformity of dried sustance is good.
Our services
We have a professional engineer team responsible for the pre sales technical consultation, technical solution in the process of sales, installatin, commissioning and after sales service for customers. Every year, we will send engineers to our overseas customer site to help customers inspect and maintain the equipment.
FAQ
Q1: Are you trading company or manufacturer?
A: We are factory.
Q2: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-30 days if the goods are not in stock, it is according to quantity.
Q3: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery.
Q4: What Information should customers give us, So that we can be able to provide you suitable quotation and service.
What minerals are you separating?
What's the maximum size of your raw minerals?
How much capacity do you need per hour for your project?